Case Study – Long Son A1 – Olefins Plant Project

For the Olefins Plant Project, deugro was awarded the contract for the transportation of more than 280,000 freight tons of petrochemical equipment from over 35 worldwide seaports and airports to the construction site on Long Son Island near Vung Tau, Vietnam. The most critical oversized and heavy lift components with a volume of nearly 178,300 freight tons were successfully delivered by 155 breakbulk shipments on 55 chartered heavy lift vessels in times of widespread and ever-changing restrictions on short notice due to the COVID-19 pandemic, and with skyrocketing freight rates and severely limited vessel and vessel space capacities.

Industry

Petrochemical

Cargo Highlight

778.1 MT and nearly 100 m C3 tower

Volume

280,000 FRT

Origins

Shipments from over 35 seaports and airports worldwide

Chartering

155 breakbulk shipments on 55 chartered heavy lift vessels

deugro Team

Over 50 experts from 16 deugro country organizations worldwide