Case Study – Jawa-1 Power Plant Project
Project Execution
As part of a 1,760-megawatt combined-cycle gas turbine power plant project in Indonesia, on behalf of GE, deugro moved approximately 80,000 freight tons of cargo, including two 435-metric-ton gas turbine 9HA.02 units, two 460-metric-ton generator stators (GEN STATs) units, and 52 heat recovery steam generators (HRSGs) with a length of 30 meters and weights of up to 240 metric tons.