Case Study – Yamal LNG Project

The Highlights

  • Shipping through the Northern Sea Route
  • Cargo weight of 860 MT, with a size of 39 x 18 x 35 m
  • Over a period of four years, deugro transported 850,000 FRT in total from all over the world to Russia, China, Indonesia, the Philippines and Belgium.
  • More than 17,500 single shipments, shipped by air, ocean and road, to various destinations around the world, including Sabetta in the Arctic North
  • Eight sea voyages shipping a total of 98,350 cbm
  • Additionally deugro shipped another 227,845 cmb, utilizing 24 sea voyages for other projects via the same NSR

Project Execution

After several years of intensive planning, engineering and execution, the various teams of deugro have managed one of the largest and most complex liquefied natural gas (LNG) projects ever executed.

More than 17,500 single shipments were shipped by all possible transportation modes, including air and ocean full charters, to various destinations around the world such as Sabetta in the Arctic North. A specialized heavy lift vessel was used together with ice breakers to ensure a safe passage. Along with experience gained dealing with local authorities to receive special permission, we have gained competence and know-how that not every project freight forwarder can offer.

Total Volume

850,000 FRT, over 17,500 single shipments

Remote Location

Deep in the Russian Arctic

Global Project

Teams of over 10 countries involved

Project Duration

4 years of planning and execution

Cargo Highlights

Heavy heater module, 860 MT, 39 x 18 x 35 m