Case Study – SCA Helios Project

The Highlights

Cargo:

  • 30000 FRT
  • 294000 MT
  • 30000 CBM

Max. heavy lift:

  • 405 MT

Total Project Investment:

  • SEK 7.8 billion (approx. USD 962.2 million)

Project Execution

deugro’s scope within this project was delivery from Shanghai, China to the job site in Östrand, Sweden. The SCA Helios Project in Östrand was an excellent example of teamwork. deugro Finland had the lead on the project and control tower, with close support from deugro (Sweden) AB for local operations on-site. With assistance from dteq Transport Engineering Solutions, a company of the deugro group, for site surveys and lifting arrangements, and deugro (China) Co., Ltd. for local operations and coordination, the execution of the project was an astounding success.

deugro’s Breakbulk & Heavy Lift Chartering Division assisted the project team with their expertise, and all parts were shipped by chartered heavy lift vessels. Even though the majority of the cargo was not stackable due to the dimensions, deugro aimed to optimize costs for the ocean transportation by shipping the cargo in three separate shipments.

Client

Valmet Technologies AB

Project Owner

SCA

 

 

Investment

USD 962.2 million

Cargo

30,000FRT; 294,000 MT; Max. heavy lift 405 MT

Origin and Project Location

From China to Sweden

 