Case Study – Parque das Conchas
The Highlights
- HSE Requirements—beyond the strict standard
- Technical Requirements—Transport engineering
- Vast Distance—Teams in multiple time zones
- Critical Move—Tug and barge alongside vessel offshore
- Zero Incidents—No harm to persons and cargo
Project Execution
Parque das Conchas (BC-10) is an energy-producing, deepwater project located in the Campos Basin, off the coast of Brazil. deugro has been awarded the transportation of accommodation modules from UAE to the BC-10 field. The modules are helping to operate a Rigless Intervention System that serves to facilitate the replacement of worn or failed caisson-based artificial lift systems deployed at the project site.
Whereas the actual transportation of the accommodation modules was rather straight forward and nothing out of the ordinary, the challenge was found by meeting SBM Offshore’s and Shell’s stringent requirements in regard to health, safety and environment (HSE) and engineering.