Case Study – Jawa-1 Power Plant Project

Project Execution

As part of a 1,760-megawatt combined-cycle gas turbine power plant project in Indonesia, on behalf of GE, deugro moved approximately 80,000 freight tons of cargo, including two 435-metric-ton gas turbine 9HA.02 units, two 460-metric-ton generator stators (GEN STATs) units, and 52 heat recovery steam generators (HRSGs) with a length of 30 meters and weights of up to 240 metric tons.

Industry

Power

 

 

Cargo

gas turbines, GEN STAT and HRSG units

 

 

Highlight

Sophisticated barge unloading concept for OSHL cargo at the jetty

Origin and Destination

From Asia, Europe and the USA to Indonesia

 

Total volume

Approx. 80,000 freight tons

Performance

On time, within budget and with zero QHSES incidents