Case Study – EGAT Project
Project Execution
For the EGAT Project, deugro Korea was contracted by its client Hyundai Engineering to move 120,000 freight tons (14,000 metric tons) of petrochemical cargo to a project site in Police, Poland. The project encompassed a considerable amount of oversized and heavy lift (OSHL) units, including an 889-metric-ton propylene-propane splitter, with impressive dimensions of 96 x 9.35 x 8.90 meters; five 613.98-metric-ton and over 72-meter-long propylene storage bullets; and a 44-meter-long, 596-metric-ton reactor.