Project Execution

For the EGAT Project, deugro Korea was contracted by its client Hyundai Engineering to move 120,000 freight tons (14,000 metric tons) of petrochemical cargo to a project site in Police, Poland. The project encompassed a considerable amount of oversized and heavy lift (OSHL) units, including an 889-metric-ton propylene-propane splitter, with impressive dimensions of 96 x 9.35 x 8.90 meters; five 613.98-metric-ton and over 72-meter-long propylene storage bullets; and a 44-meter-long, 596-metric-ton reactor.

Industry

Petrochemical

On-carriage

Comprehensive transport engineering and civil works

Volume

120,000 FRT

Weather Challenges

-17°C, heavy snowfall, ice and strong winds

Cargo Highlights

889 MT and 96 m  propylene-propane splitter

Performance

On time, within budget, without QHSES incidents