To supply the Donghae-2 gas field, Subsea 7 (Singapore) Pte Ltd awarded deugro the contract to transport three laden reels and accessories to Loyang, Singapore.

The Challenges

  • Tight time frame for ocean voyage from Europe to Singapore
  • Strict sequence loading order for transpooling operations directly from barges
  • Complex pre-setting/dismantling of under roller bases and stand-by operations of barges
  • Managing of flexible barge delivery schedules in Singapore

Industry

Oil and gas

Client

Subsea 7 (Singapore) Pte Ltd

Project Owner

Korea National Oil Corporation

Cargo

2x flow line reels, 1x umbilical reel, accessories

Volume

1,973 FRT in total

Max. Heavy Lift

245 MT