Power

Providing value-added logistics services to project clients in the power generation, transmission and distribution industry has been a key focus since deugro was established in 1924.

 

We provide innovative and secure logistics solutions to energize communities and industries across the globe.

 

Focus areas

  • Power generation plants (combined-cycle, hydro, nuclear, geothermal, etc.)
  • Power transmission and distribution, and grid access (HVDC, substations, converter stations, etc.)
  • Components such as turbines, generators, cables, HRSGs and transformers
  • Energy storage (battery plants, etc.)

Value proposition

  • deugro collaborates with manufacturers, EPCs and investors in the power industry to offer tailored logistics and supply chain solutions for power generation, transmission, distribution and storage.
  • We specialize in turnkey project execution and swift delivery of essential components, ensuring operational continuity even in remote locations.
 

Jawa-1 Power Plant Project

As part of a 1,760-megawatt combined-cycle gas turbine power plant project in Indonesia, on behalf of GE, deugro moved approximately 80,000 freight tons of cargo, including two 435-metric-ton gas turbine 9HA.02 units, two 460-metric-ton generator stators (GEN STATs) units, and 52 heat recovery steam generators (HRSGs) with a length of 30 meters and weights of up to 240 metric tons.

 

Icon for

Industry: Power

Icon for

Cargo: Gas turbines, GEN STAT and HRSG units

Icon for

Highlight: Sophisticated barge unloading concept for OSHL cargo at the jetty

Icon for

Origin and Destination: From Asia, Europe and the USA to Indonesia

Icon for

Total volume: Approx. 80,000 freight tons

Icon for

Performance: On time, within budget and with zero QHSES incidents

 

Air Freight Charter from Europe to Indonesia

A major customer in Indonesia awarded deugro (Singapore) Pte Ltd an air freight charter from Europe to Indonesia. However, this air freight charter, which at first glance seemed like another daily operation for deugro, actually involved a series of challenges and special transport pre-arrangements.

 

The Challenges

  • Ground-leveling works at the airport in Kuala Namu in order to receive the heavy cargo
  • Tight time schedule during the holiday season
  • Loading in heavy weather conditions

Project Execution

The client made clear from the very beginning that the over 95 tons of cargo had to arrive at the construction site in northern Sumatra, Indonesia in early January, just days after the transformers were expected to be released from the factory in Finland. The shipment consisted of two transformers, weighing 36 tons each, plus accessories out of Vaasa, Finland and two five-ton rectifiers coming out of Baden, Switzerland.

deugro was only able to secure the shipment by working as a team with our air freight office in Singapore and our colleagues in Finland, who worked on the overland freight. After evaluating various options, we proposed to the client that we would consolidate both shipments in Helsinki and arrange for a combined air charter to Kuala Namu, Indonesia. Because of the transformer’s dimensions (4.9m x 2.5m x 3.3 meters each), we needed to use an Antonov AN-124-100 aircraft. The remaining capacity of this open-plan aircraft would fit the five-ton rectifiers from Switzerland perfectly. During planning and execution, this solution proved to be the most cost-effective for our client.

 

Belo Monte

The government of Brazil set up a growth acceleration program aimed at developing the infrastructure of roads and dams, mainly in the Amazon area in order to boost economic growth in the region. When finally up and running, Belo Monte will be the third-largest dam in the world, behind Three Gorges (20,300 MW), China, and Itaipú (14,000 MW), partly in Brazil and Paraguay. The dam will be the main Brazilian hydroelectric plant, generating more than 11,000 megawatts of power at full capacity. The power generated will be transmitted over a 2,000-kilometer-long transmission line, able to provide sustainable energy for 17 entire Brazilian states and hence 60 million people. This amount of energy would replace the output of about eight nuclear power plants.

 

The Challenges

  • Significant tide changes / winds / currents and busy ferry traffic on the Amazon River
  • Steep 14% incline at discharge in Xingu
  • Vast distance – routes spanning half the Earth’s circumference
  • Difficult and complex Brazilian terrain
  • Roads affected by cargo weight and size

Project Execution

deugro was awarded the project for executing the transportation of the project’s phase one, which encompasses two subsequent projects. The first project, UHE Belo Monte (hydro power plant), a consortium formed by the market leaders of this segment, includes the transportation of transformers and equipment (turbine rotor and turbine shaft) from Brazilian factories to the Belo Monte complex. The second project, High Voltage Direct Current (HVDC), likewise contains the transportation of transformers and equipment but from worldwide origins to two corresponding converter stations located in Xingu (state of Pará) and Estreito (state of Minas Gerais), Brazil.

Icon for

Industry: Power

Icon for

Significant tide changes, winds, currents and busy ferry traffic on the Amazon River

Icon for

Steep 14% incline at discharge in Xingu

Icon for

Vast distance – routes spanning half the Earth’s circumference

Icon for

Difficult and complex Brazilian terrain

Icon for

Roads affected by cargo weight and size

 
Turkish Crossing Project, Ocean voyage to Istanbul Turkey.

Turkish Crossing Project

To ensure ongoing cable-laying operations for the Turkish Crossing Project, deugro Italy, in cooperation with deugro Chartering, timely delivered 54 kilometers of urgent HVAC cables to a cable-laying vessel in Turkey.

 

Icon for

Industry: Power

Icon for

Cargo: 54 km of HVAC cables

Icon for

Cargo Weight: Total of 3,300 MT

Icon for

Cargo Highlight: Complex coordination of operations, engineering and installation

Icon for

Service: Complete turnkey, all-in-one service solution

Icon for

Timeline: High urgency to ensure ongoing cable-laying operations