Mining and Metals
From concept to completion, deugro has deep expertise in mining projects and operations to meet the demands of global mining houses and EPCs working on mining and processing facilities across the world.
We offer customized logistics solutions for various mining activities and related industries like cement and metallurgy.
Focus areas
- Mining industry
(excavators, conveyor belts, car dumpers, ship loaders, crushers, feeders, modules) - Cement industry
- Metallurgy industry
(steel mills, aluminum smelters, etc.)
Value proposition
- We design safe, innovative and reliable logistics solutions for efficient, high-quality delivery within the mining and metals industry.
- Our expertise includes the safe delivery of general cargo and oversized components—while respecting local communities and ecosystems.
- From handling conveyor belts to complex modules, we manage remote sites and tight schedules.

Industry: Mining and Metals
Cargo: Bulk material handling and processing system
Volume: 384,449 CBM of cargo with a combined weight of 21,000 MT
Routes: From Europe, Canada and Vietnam to the remote north of the Arctic Circle
Cargo Highlight: Crusher building, 1,800 MT, 32 x 29 x 34 m
Timeline: Location only accessible two months a year









Project Execution
deugro was involved in the project from the very early stages. The first investigations regarding the routing of the last transport leg to the site started two years in advance of the actual project execution. At this time, the design of the crane trolley was still in progress.
Several updates of the trolley design—affecting dimensions and transport weight—required flexible planning and amendment of suitable transport routing as well as of trailer configuration during the production process.
Industry: Mining and metals
Volume: 920 CBM and custom-made listing equipment
Cargo Highlight: 1 crane trolley, 14.47 x 7.34 x 8.66 m
Max. Heavy Lift: 117 MT






deugro moved Approximately 550,000 FRT during this Project
During this project we shipped material and equipment for the mine, the pyrometallurgical nickel foundry, the power plant and other complementary infrastructure, including the deepwater port at Vavouto, the 11-kilometre land-based conveyor and a seawater desalination plant.
Although there was quite some cargo size and volume on one vessel, the main challenge was timing, as the vessel was loaded in China during the Chinese New Year (CNY) holiday period.
To ensure that the cargo was swiftly loaded without delay due to CNY, everything was loaded in advance onto barges and all cargo was loaded from the barge to the MV while anchored. This helped to avoid the labor shortage and port shutdown during CNY.
In addition, we had to comply with stringent Marine Warranty Surveyor (MWS) requirements, including detailed engineering calculations and drawings to provide for the barges and ocean vessels.
Client: HATCH-Technip (JV)
Destination: Vavouto, New Caledonia
Period: 2008–2012
Cargo: Large mining components and steel structures
Scope: Turnkey project
Highlight: Heavy lifts with unit weight of up to 450 tons; 550,000 FRT shipped






Client: FLSmidth A/S
Owner: Xuan Thanh
Destination: Vietnam
Period: 2021–2022
Cargo: Cement plant, 45,000 FRT
Scope: 45,000 FRT multiple origins
Highlight: Largest cement plant that was ever constructed by FLSmidth